Getting Fired Up: 1928/1929 1-1/4 HP Baker Monitor VJ

Peter Rooke adapts a water pump for the Baker Monitor VJ — Part 2 of 4

Cleaned flange
The flange after cleaning with a large area of contact. A weighted wrench (just visible at lower left) was left in place for several days to ease the side plug.
Photo by Peter Rooke