Running a Line Shaft with a 15 HP Reid Type A

The heart of a blacksmith shop

05-06-024-Sanderson_09.jpg
The engine room. Joel laid the stone foundation himself, which took about seven months. The engine room’s floor is recessed to give the necessary belt length and head room.